Waste Pond B Stabilization
Contract: N62473-19-F-5051 Waste Pond B Stabilization
Client: NAVFAC SW – Naval Air Station Lemoore
MGS was awarded this task order as part of our IDIQ at NAS Lemoore. We were contracted to remove and replace existing deteriorated steel corrugated outlet pipe from transfer gate, which discharges to the Waste Stabilization Pond ‘B”. This also includes installing a new packaged metering manhole & 24” HDPE corrugated waste water Outlet pipe & fittings.



